Resource
Baiquan Substation Project – Static Load Pile Testing
Jinan Metro Line 7 Phase I – Civil Works Section 4-1
Retaining Wall Anti-Slide Pile Testing – Hanjin Road Construction, Linchuan District
Surrounding Rock Loosening Zone Detection – Mengdigou Hydropower Station, Yalong River Basin
Factory Reconstruction Project – Pile Length Verification by Parallel Seismic Testing
G108 Luojiang Section Reconstruction and Expansion Project
Dalian Airport Project – Reinforcement Cage Length Testing
High strain PDA testing project of Hankou Station North Square Project
Construction project of an industrial plant in Tianjin
Zhaotong Station Building Project of the Chongqing–Kunming Railway Line
Tingcheng Jingyue Li First Phase – Buildings 11 & 15 and Non-Civil Air Defense Basement Project
Liaocheng No. 3 Middle School Underground Garage, Dongchang Road Green and Low-Carbon Renovation Project, Liaocheng City, Shandong Province