Suqian Avenue Rapid Transformation Project – Section 1

Release time:

2025-09-29 10:24

Project Overview

Project Name: Suqian Avenue (Yingbin Avenue to Yangshe Road) Rapid Transformation Project – Section 1

Project Type: Elevated Bridge Foundation (Cast-in-Place Piles)

Location: Suqian City, Jiangsu Province, from Yingbin Avenue in the west to the Main Canal Bridge in the east

Testing Equipment: RSM-SY7D Ultrasonic Pile Integrity Tester

 

Testing Purpose & Method
The purpose of the testing was construction self-inspection to evaluate the integrity of foundation piles supporting the elevated bridge structure. The ultrasonic cross-hole method was applied to detect possible pile defects, check homogeneity, and verify compliance with design and safety standards.

 

Testing Scope

Integrity testing of cast-in-place piles used in the elevated bridge foundation

Evaluation of continuity, density, and potential internal anomalies

 

Testing Results

Main Issues: None detected

Impact on Project: No adverse findings; piles met design specifications

 

Evaluation

Engineering Evaluation: The tested piles demonstrated full integrity, confirming the reliability of the bridge foundation.

Equipment Performance: The RSM-SY7D provided stable signals and clear detection data, delivering excellent on-site testing performance.