Project Overview
Project Name: Suqian Avenue (Yingbin Avenue to Yangshe Road) Rapid Transformation Project – Section 1
Project Type: Elevated Bridge Foundation (Cast-in-Place Piles)
Location: Suqian City, Jiangsu Province, from Yingbin Avenue in the west to the Main Canal Bridge in the east
Testing Equipment: RSM-SY7D Ultrasonic Pile Integrity Tester
Testing Purpose & Method
The purpose of the testing was construction self-inspection to evaluate the integrity of foundation piles supporting the elevated bridge structure. The ultrasonic cross-hole method was applied to detect possible pile defects, check homogeneity, and verify compliance with design and safety standards.
Testing Scope
Integrity testing of cast-in-place piles used in the elevated bridge foundation
Evaluation of continuity, density, and potential internal anomalies
Testing Results
Main Issues: None detected
Impact on Project: No adverse findings; piles met design specifications
Evaluation
Engineering Evaluation: The tested piles demonstrated full integrity, confirming the reliability of the bridge foundation.
Equipment Performance: The RSM-SY7D provided stable signals and clear detection data, delivering excellent on-site testing performance.