Project Name: G108 Luojiang Section Reconstruction and Expansion Project
-
Project Type: Highway Construction
-
Location: Deyang, China
-
Testing Equipment: RSM-SY8(C) Cross-Hole Sonic Logging Tester
Testing Purpose & Method
The project required a comprehensive inspection of pile foundations to ensure structural safety and compliance with design requirements. The testing was conducted using the cross-hole sonic logging method, which provides accurate and reliable data on pile shaft integrity by measuring wave velocity changes across pre-installed access tubes.
Testing Scope
-
Objective: Integrity verification of all foundation piles
-
Method: Sonic cross-hole testing (full inspection)
-
Parameters Measured: Pile continuity, potential defects, and internal homogeneity
Testing Results
-
Major Issues Detected: None
-
The test results indicated that all inspected piles were free of significant defects.
-
Pile integrity was confirmed to meet design and construction standards.
Evaluation
-
Overall Project Evaluation: The pile foundations demonstrated good integrity and satisfied project requirements for highway foundation safety.
-
Equipment Performance: The RSM-SY8(C) device fully met on-site testing needs, offering stable performance, clear data acquisition, and efficient operation.