Factory Reconstruction Project – Pile Length Verification by Parallel Seismic Testing
Release time:
2025-09-29 09:06
Project Overview
Project Name: Factory Reconstruction Project
Project Type: Building Construction
Location: Cixi, Ningbo, China
Testing Equipment: RSM-PST(A) Parallel Seismic Tester
Testing Purpose & Method
The purpose of the testing was third-party verification of pile lengths in order to ensure compliance with design requirements and to safeguard construction quality. The parallel seismic transmission method was applied, which is particularly effective for determining pile length where direct access to the pile toe is not feasible.
Testing Scope
Objective: Length verification of prestressed pipe piles
Method: Parallel Seismic Testing (PST)
Importance: Pile length directly influences both bearing capacity and overall building stability. This test also serves to check whether the construction unit strictly adhered to design specifications, preventing risks such as insufficient pile length caused by improper drilling depth or material reduction.
Testing Results
Major Issues: None detected
Findings: The tested pile lengths were consistent with design requirements.
Reliability: Original field data confirmed clear seismic wave signals, enabling accurate pile length determination.
Evaluation
Overall Project Evaluation: The tested piles fully complied with the owner’s requirements, confirming foundation reliability.
Equipment Performance: The RSM-PST(A) delivered accurate, stable results with strong signal clarity, fully meeting on-site testing demands.