Resource
Construction project of an industrial plant in Tianjin
Release time:
2025-09-09 15:13
Case Study: Industrial Plant Construction Project in Tianjin
Project Overview
Project: Construction of an industrial plant in Tianjin
Testing Items: Pile integrity testing of prestressed concrete pipe piles (diameter 400 mm, length 19 m)
Testing Time: September 2021
Testing Details
The project involved a total of 7 testing units, with 210 piles tested using the PIT reflected wave method.
Prestressed Pipe Piles:
Quantity: 182 piles
Diameter: 400 mm
Length: 19 m
Structure: Two-section connections
Result: Testing data showed clear bottom signals, good pile positioning, and overall pile integrity.
Bored Cast-in-Place Piles:
Quantity: 28 piles
Diameter: 600 mm
Lengths: 19 m, 20 m, and 21 m
Result: On-site data confirmed the piles’ structural soundness and reliable integrity.
Customer Feedback
The client praised the new testing equipment for its improved comfort and usability. The updated instrument strap was noted as comfortable, the screen display more refined, and the touchscreen controls more user-friendly. Test results were presented clearly and intuitively, enhancing on-site efficiency.