Case Study: Industrial Plant Construction Project in Tianjin

Project Overview

Project: Construction of an industrial plant in Tianjin

Testing Items: Pile integrity testing of prestressed concrete pipe piles (diameter 400 mm, length 19 m)

Testing Time: September 2021

Testing Details
The project involved a total of 7 testing units, with 210 piles tested using the PIT reflected wave method.

Prestressed Pipe Piles:

Quantity: 182 piles

Diameter: 400 mm

Length: 19 m

Structure: Two-section connections

Result: Testing data showed clear bottom signals, good pile positioning, and overall pile integrity.

Bored Cast-in-Place Piles:

Quantity: 28 piles

Diameter: 600 mm

Lengths: 19 m, 20 m, and 21 m

Result: On-site data confirmed the piles’ structural soundness and reliable integrity.

Customer Feedback
The client praised the new testing equipment for its improved comfort and usability. The updated instrument strap was noted as comfortable, the screen display more refined, and the touchscreen controls more user-friendly. Test results were presented clearly and intuitively, enhancing on-site efficiency.