Case Study: Kunming Yuecaiyun Garden Project

Project Overview

  • Project Name: Kunming Yuecaiyun Garden

  • Project Type: Building Construction (Residential)

  • Location: Chunrong East Road, Chenggong District, Kunming City, China

  • Testing Organization: Chengdu Bangtai

  • Testing Date: May 15, 2024

  • Testing Equipment: Low Strain Pile Integrity Tester

Testing Purpose & Background
The primary objective of this project was to evaluate the integrity of foundation piles supporting the residential buildings. Given the importance of structural safety for high-rise housing, pile integrity testing was conducted to ensure the foundations complied with design standards and construction quality requirements.

Testing Method

  • Method Applied: Low Strain Integrity Testing (Sonic Echo Method)

  • Scope: Random sampling inspection of residential building piles

  • Procedure: Test signals were collected by attaching sensors to pile heads. Wave reflections were analyzed to identify potential defects, discontinuities, or weak zones along the pile shaft.

Results & Evaluation

  • Pile Integrity: The tested piles showed no significant defects, with the overall integrity assessed as good.

  • Project Evaluation: The inspection confirmed that the foundation piles meet quality requirements, providing a safe and reliable base for the residential structures.